ryd0501021102 发表于 2015-12-21

{:6_525:}{:6_525:}

15958003715 发表于 2015-12-21

111111111111

笑面鬼生 发表于 2015-12-21

看看

luguxunmeng 发表于 2015-12-21

11111111

TTtiamo11 发表于 2015-12-21

谢谢分享

鱼先森 发表于 2015-12-21

A: High Operator Costs (High Cost Country) in combination with very low Planned Cycle Time has the best opportunity to use CR B: High Energy Load of Operator is optimum selection of replace manual work by CR
C: Optimum position for CR is in the front of U-cell. Side position lead for wider internal space and/or unbalance of operators.
D: As more manual work (in comparison to operator time) the CR is able to cover, as more is effective
E: Sensitive Processes for Operator but simple or possible for CR
F: LCA solution(s) must be properly negotiate first before the CR installation. G: Substitution of standard automation cells by CR

嘟嘟熊 发表于 2015-12-21

呵呵哒

孤影_tgKg9 发表于 2015-12-21

1111111111111111

a2303780 发表于 2015-12-21

感谢分享

糖心酥 发表于 2015-12-21

ssssssssss
页: 187 188 189 190 191 192 193 194 195 196 [197] 198 199 200 201 202 203 204 205 206
查看完整版本: 舞神傲血宏自用版收藏BY 网通一/二区 李忘生 一六指狂魔一